Objectives of MUTP

  • Bringing down the passengers per 9 coach train to 3000 as against existing 5000.
  • Segregate the suburban train operations from main line passenger and freight services.

 MUTP Phase I (Rail Component)

5th & 6th Lines Kurla - Thane

Optimization of Central Railway

Optimization of Harbour line

5th line Mahim - Santacruz

Quadrupling of Borivali-Virar section

Optimization of Western Railway

DC to AC Conversion

EMU procurement & manufacture

Stabling lines for EMUs

Maintenance facilities for EMUs

Virar Car shed

Track Machines

Institutional strengthening & studies

Resettlement & Rehabilitation

Infrastructural inputs in MUTP Phase I

  • Addition of 93 track kms - base figure 790 kms [Excluding loop line and yards] (34 kms in Thane-Turbhe-Vashi section and 53 kms in Virar-Borivali section under MUTP have since been added).
  • Induction of dual voltage 101 new 9-car rakes.  51 on additional account and 50 on conversion account.
  • Resettlement & Rehabilitation of about 15,000 Project Affected Households.
  • Running of 12-car rakes on all lines (excluding Harbour line) by lengthening of all platforms.
  • Achieving 3 minutes headway on all the lines (re-spacing of signaling to be done).
  • DC to AC conversion in all suburban sections except Thane-CSTM section. (to be taken up in Phase II).

Benefits of MUTP Phase I

  • 550 new trains 25%  increase in total trains per day.
  • On fast line, all trains will be of 12 cars.  On slow line, 20% of trains will be of 12 cars.
  • Vehicle kms per day will increase by 33 %.
  • Overcrowding during peak hour peak direction will come down from existing, over 5000 commuters to 3600 commuters per 9-car rake.

MUTP Phase II

  • 5th & 6th lines CSTM - Kurla
  • 5th & 6th lines Thane - Diwa
  • 6th line Borivali - Mumbai Central
  • Extension of Harbour Line from Andheri to Goregaon
  • DC to AC Conversion (CSTM - Thane section)
  • Station Improvement and Trespassing Control Scheme.
  • Resettlement & Rehabilitation.
  • EMU procurement & manufacture.
  • Maintenance facilities for EMUs.
  • Stabling lines for EMUs.
  • Technical Assistance & Institutional Strengthening.

Infrasturctural inputs in MUTP Phase II

  • Addition of 88 track kms - existing 790 kms and 93 kms being added in MUTP Phase I.
  • 96 new 9-car rakes.
  • DC to AC conversion in Thane - CSTM section (172 Track km), completing the DC-AC conversion on Mumbai Suburban system.
  • Resettlement & Rehablitation of about 3,000 Project Affected Households.

Benefits of MUTP Phase II

  • Will segregate the suburban train operations from the main line passenger & freight services.
  • All trains running on the suburban lines will be of 12 car.
  • 800 New trains - Increase of 30 % over and above MUTP Phase I.
  • Bringing down the passengers per 9 coach train to 3000 as against existing 5000 and 3600 on completion of MUTP Phase I.



Source : Welcome to Mumbai Railway Vikas Corporation Ltd. CMS Team Last Reviewed on: 13-02-2011  

  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.